Sign up
Forgot password?
FAQ: Login

IEC 60076-4 Power transformers - Guide to the lightning impulse and switching impulse testing

  • pdf file
  • size 2,79 MB
  • added by
  • info modified
IEC 60076-4 Power transformers - Guide to the lightning impulse and switching impulse testing
This part of IEC 60076 gives guidance and explanatory comments on the existing procedures for lightning and switching impulse testing of power transformers to supplement the requirements of IEC 60076-3. It is also generally applicable to the testing of reactors (see IEC 60289), modifications to power transformer procedures being indicated where required.
Information is given on waveshapes, test circuits including test connections, earthing practices, failure detection methods, test procedures, measuring techniques and interpretation of results.
  • Sign up or login using form at top of the page to download this file.
  • Sign up
Up