Document, 1974. — Railwaysarchive.co.uk. — 32 p.
Document Summary
A promotional booklet for the recently-completed second stage of the West Coast Electrification, from Weaver Junction to Glasgow. Includes a potted history of the route, the development of electrification systems from 1500V DC to 25kV AC, and details of the infrastructure and rolling stock changes introduced for the May 1974 timetable.
This document was kindly sourced from Archive Collection and is in our Publicity material collection. It was added to the Archive on 14th March 2005.