Chicago: Precast/Prestressed Concrete Institute.
Journal March-April 2000 (11 Articles):
- Precast Concrete Alternate Provides Unique Solution for Airport Terminal Bridge
- Design-Construction of a Breakwater/Pier Structure at U. S. Naval Station Everett
- Continuity of Precast Prestressed Spliced-Girder Bridges Under Seismic Loads
- Axial Load Tests of Concrete Compression Members with High Strength Spiral Reinforcement
- Transfer and Development Lengths of FRP Prestressing Tendons
- Repair and Performance of a Full-Scale Pretensioned Concrete Girder
- Reducing Seismic Hazards of Existing Buildings: A Status Report
- 2400 Lakeview Parkway - Georgia 400 Center
- Problems and Solutions
- Chairman's Message
- Industry News